冷再生泡沫瀝青冷再生機(jī)出租施工的技術(shù)有哪些?
來源:http://www.beianedu.cn/ 日期:2020-10-19
  瀝青冷再生技術(shù),其實(shí)就是將泡沫瀝青的一些優(yōu)良性能應(yīng)用于實(shí)際應(yīng)用的技術(shù)。與傳統(tǒng)工藝相比,在實(shí)際應(yīng)用中效果較好。但是,用戶要想充分發(fā)揮技術(shù)優(yōu)勢(shì),在實(shí)際施工過程中需要遵循以下流程:
  The cold recycling technology of asphalt is actually a technology that applies some good properties of foamed asphalt to practical application. Compared with the traditional process, the effect is better in practical application. However, in the actual construction process, users need to follow the following technical advantages:
  在施工過程中,冷再生租賃過來以后,首先需要用銑刨機(jī)將要進(jìn)行鋪設(shè)的瀝青面層清洗干凈。需要大修的路面要磨平到基層。廢料可由裝車車重新裝車回用,然后鋪設(shè)泡沫瀝青混凝土。需要注意的是,這些冷再生技術(shù)在鋪筑新路面過程中不受天氣條件的限制,即使在寒冷的天氣和雨天,仍能進(jìn)行施工。單從這點(diǎn)就可以看出,它在當(dāng)今市場(chǎng)上的應(yīng)用非常廣泛。
  In the construction process, after the cold recycling lease, the asphalt surface course to be paved shall be cleaned with a milling machine. The pavement to be overhauled shall be ground to the base. The waste can be reloaded by the loading car, and then the foamed asphalt concrete will be laid. It should be noted that these cold recycling technologies are not limited by the weather conditions in the process of paving new pavement, even in cold weather and rainy days, construction can still be carried out. From this point we can see that it is widely used in today's market.
  以上是泡沫瀝青在施工過程中的冷再生工藝流程。只要用戶按照上述工藝進(jìn)行路面攤鋪,那么它的效果必然就是有保證的。
  The above is the cold recycling process of foamed asphalt in construction. As long as the user carries on the pavement paving according to the above technology, then its effect must be guaranteed.
                 冷再生機(jī)出租
  在實(shí)施一個(gè)項(xiàng)目時(shí),需要進(jìn)行質(zhì)量控制,以確保效果。那么,如何控制冷再生的質(zhì)量呢?為保證冷再生租賃的質(zhì)量控制,應(yīng)遵循以下三點(diǎn):
  In the implementation of a project, quality control is needed to ensure the effect. Then, how to control the quality of cold regeneration? In order to ensure the quality control of cold regeneration leasing, the following three points should be followed:
  1、原材料的各項(xiàng)試驗(yàn)要在施工前進(jìn)行,檢驗(yàn)合格后方可使用。施工前應(yīng)對(duì)混合料進(jìn)行各種試驗(yàn),確認(rèn)材料無變化后方可施工。
  1. All tests of raw materials should be carried out before construction and can be used only after passing the inspection. Before construction, all kinds of tests should be carried out on the mixture, and the construction can be carried out after confirming that the materials have no change.
  2、施工過程中,應(yīng)隨時(shí)檢測(cè)混合料中粘結(jié)劑和外加劑的含量,確保施工質(zhì)量。
  2. During the construction process, the content of binder and admixture in the mixture should be detected at any time to ensure the construction quality.
  3、在施工過程中,應(yīng)根據(jù)混合料的拌和性和可加工性及時(shí)調(diào)整耗水量。
  3. In the construction process, the water consumption should be adjusted timely according to the mixing and processability of the mixture.
  以上是關(guān)于冷再生泡沫瀝青冷再生機(jī)施工的技術(shù)的介紹,希望對(duì)大家有所幫助,如想了解更多內(nèi)容請(qǐng)多多關(guān)注我們的網(wǎng)站。
  The above is about cold recycling foam asphalt cold recycling machine construction technology, hope to help everyone, if you want to know more content, please pay more attention to our website.