冷再生機(jī)租賃對(duì)瀝青路面改造的配置要求?
來源:http://www.beianedu.cn/ 日期:2020-10-14
十幾年前在道路施工時(shí),需要將舊的瀝青路面鏟除,造成了很大的浪費(fèi),而現(xiàn)在冷再生機(jī)出現(xiàn) ,可以減少浪費(fèi)。冷再生機(jī)是指瀝青路面就地冷再生是利用一體化的再生設(shè)備、添加材料、一 次拌和成型工藝,通過新鋪結(jié)構(gòu)面層,構(gòu)成舊路面改造新的一套完整體系。下面冷再生機(jī)租賃廠家就來講解一下關(guān)于對(duì)瀝青路面改造的配置要求和準(zhǔn)備工作。
More than ten years ago, in the road construction, the old asphalt pavement needs to be removed, resulting in a lot of waste, but now the emergence of cold recycling machine, can reduce waste. Cold recycling machine refers to the cold in place recycling of asphalt pavement, which is a complete set of new system of old pavement reconstruction by using the integrated recycling equipment, adding materials and one-time mixing molding process through the new pavement structure. The following cold recycling machine rental manufacturers will explain the configuration requirements and preparations for asphalt pavement reconstruction.
準(zhǔn)備工作:
preparation:
再生前的各項(xiàng)準(zhǔn)備工作在施工前到位,確保工期正常進(jìn)行。主要內(nèi)容包括:人員準(zhǔn)備、機(jī) 械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。
All preparations before regeneration shall be in place before construction to ensure normal construction period. The main contents include: Personnel Preparation, mechanical preparation, material preparation, traffic coordination and logistics support.
材料要求:
Material requirements:
水泥選用強(qiáng)度等級(jí)為32.5、初凝時(shí)間≥3h、終凝時(shí)間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥 。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h. Cement should have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
機(jī)械要求:
Mechanical requirements:
工程施工過程通過再生機(jī)組來完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車、平地機(jī)、 壓路機(jī)等。
The construction process of the project is completed by regeneration unit, which includes: Cold Recycling host, cement slurry truck, grader, roller, etc.
人員要求:
Personnel requirements:
工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過冷再生培訓(xùn)并經(jīng)過考核合格后方可上崗。
Engineering and technical personnel and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
工程協(xié)調(diào):
Project coordination:
作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作 業(yè)面的遮擋。
The overall construction plan shall be made, the half width construction without interruption of traffic shall be adopted, the traffic dredging work during the construction period shall be well done, and the shelter of the construction working surface shall be prepared.
以上是關(guān)于冷再生機(jī)對(duì)瀝青路面改造的配置要求的介紹,相信大家都有所了解了,如想了解更多內(nèi)容歡迎點(diǎn)擊我們的http://www.beianedu.cn網(wǎng)站。
The above is about the configuration requirements of cold recycling machine for asphalt pavement reconstruction. I believe you all know something about it. If you want to know more, please click our http://www.beianedu.cn Website.