水泥撒布車和冷再生機(jī)在道路施工過(guò)程中的應(yīng)用
來(lái)源:http://www.beianedu.cn/ 日期:2023-04-17
針對(duì)實(shí)際的道路維修,須要水泥撒布車和冷再生機(jī)共同出戰(zhàn)進(jìn)行,大概的修理措施就是先選擇檢驗(yàn)樣本開(kāi)展抽樣解析,隨后對(duì)須要再造的地面開(kāi)展就地冷再生檢修,隨后在派撒布車上場(chǎng)灑布水泥。那么其具體施工過(guò)程是什么呢?接下來(lái)水泥撒布車出租廠家小編就來(lái)介紹一下。
For actual road maintenance, cement spreaders and cold recycling machines need to work together. The general repair measure is to first select inspection samples for sampling analysis, then carry out on-site cold recycling maintenance on the ground that needs to be rebuilt, and then dispatch spreaders to sprinkle cement on site. So what is the specific construction process? Next, the editor of the cement spreader rental manufacturer will introduce it.
施工流程
Construction process
1、水泥撒布
1. Cement spreading
依照配比布置的混凝土劑量和再造材質(zhì)的高干密度等數(shù)劇,測(cè)算獲得每平米的混凝土凈重,選用水泥自動(dòng)撒布車在地面上均勻?yàn)⒉蓟炷痢?/div>
Calculate the net weight of concrete per square meter based on the dosage of concrete arranged in the ratio and the high dry density of the recycled material. Use a cement automatic spreader to evenly distribute the concrete on the ground.
2、冷再生機(jī)施工
2. Cold regeneration machine construction
對(duì)半幅4.6m地面應(yīng)用WR240開(kāi)展就地再造,2.4m的銑刨寬度2次工作就可成功半幅施工,WR240再生機(jī)銑刨拌和深度為20cm,行駛速度為7m/min。
On site reconstruction of half 4.6m of ground using WR240 can be successfully carried out with a milling width of 2.4m in two operations. The milling and mixing depth of WR240 recycling machine is 20cm, and the driving speed is 7m/min.
3、平整和夯實(shí)
3. Leveling and compaction
WR240就地再生結(jié)束后,1臺(tái)26噸單鋼輪壓路機(jī)隨后開(kāi)展靜壓1遍,隨后平地機(jī)開(kāi)展平整;接著,26噸單鋼輪壓路機(jī)開(kāi)展強(qiáng)振夯實(shí)3遍和弱振3遍進(jìn)行復(fù)壓,終使用26噸膠輪壓路機(jī)夯實(shí)5遍成功終壓。
After WR240 local regeneration, a 26 ton single drum roller will be statically pressed once, and then the grader will be leveled; Next, a 26 ton single steel wheel roller was used to carry out strong vibration compaction for 3 times and weak vibration compaction for 3 times for re compaction, and finally, a 26 ton rubber wheel roller was used to compact 5 times successfully for final compaction.
4、遮蓋養(yǎng)生
4. Covering for health preservation
擊實(shí)結(jié)束的道路,馬上應(yīng)用水車勻稱噴撒一遍水,并遮蓋復(fù)合土工膜開(kāi)展養(yǎng)生7天,養(yǎng)生期內(nèi)上、下午各撒水一次。
After the compaction is completed, the road should be immediately sprayed with water evenly by a water truck, and the composite geomembrane should be covered for 7 days of curing. During the curing period, water should be sprinkled once in the morning and once in the afternoon.
以上就是水泥撒布車和冷再升機(jī)在現(xiàn)實(shí)公路施工中的施工流程內(nèi)容了,在具體運(yùn)用中,更為強(qiáng)大的動(dòng)力,更加節(jié)約了土建工程時(shí)間,提升了施工效率,防止了由于人工操作導(dǎo)致的不良影響危害,同時(shí)很大的節(jié)約了人才資源和時(shí)間,充分確保了全部項(xiàng)目的品質(zhì)。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://www.beianedu.cn咨詢了解吧!
The above is the construction process of cement spreaders and cold reheaters in real highway construction. In practical applications, they have more powerful power, save more time in civil engineering, improve construction efficiency, prevent adverse effects and hazards caused by manual operation, and greatly save talent resources and time, fully ensuring the quality of all projects. For more related content, come to our website http://www.beianedu.cn Consult and understand!