冷再生機租賃廠家在道路施工前要做好充分的準(zhǔn)備工作,才能保障整個施工過程的順利進(jìn)行,需要做好哪些準(zhǔn)備工作呢?
The leasing manufacturer of cold regenerator should make full preparations before road construction in order to ensure the smooth progress of the whole construction process. What preparations should be made?
1、要建立嚴(yán)謹(jǐn)、規(guī)范的內(nèi)部約束、考核、激勵機制,用制度管人,用規(guī)章管理工程。
1. We should establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with rules.
2、要補充調(diào)查工程沿線影響施工的因素,標(biāo)注出平面位置圖,并進(jìn)行、論證,寫出調(diào)查報告,作為修訂施工方案、編制施工控制預(yù)算的依據(jù)。
2. The factors affecting the construction along the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be prepared and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設(shè)計意圖,澄清圖紙中的問題,恢復(fù)定線和施工放樣。對所有控制點進(jìn)行加密、保護(hù)、記錄。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據(jù)施工合同協(xié)議和現(xiàn)場調(diào)研認(rèn)真編制施工控制預(yù)算,作為控制支出、進(jìn)行成本預(yù)測分析、經(jīng)濟(jì)核算以及統(tǒng)計工程進(jìn)度的依據(jù)。
4. Carefully prepare the construction control budget according to the construction contract agreement and on-site investigation as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.
冷再生機出租
Rental of cold regenerator
5、進(jìn)行業(yè)務(wù)、技術(shù)培訓(xùn)和技術(shù)交底,使相關(guān)人員對工程的技術(shù)標(biāo)準(zhǔn)、操作規(guī)程、質(zhì)量控制、資料整理有全面的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6、建立工地試驗室,并申請臨時資質(zhì)。對施工中擬使用的各種原材料取樣試驗,建立相關(guān)技術(shù)參數(shù)的數(shù)據(jù)庫。
6. Establish a site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in construction, and establish a database of relevant technical parameters.
7、繪制關(guān)鍵工序施工工藝流程圖和試驗操作規(guī)程、質(zhì)量檢查評定、計量支付、設(shè)計變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagrams, and put the charts on the wall.
8、根據(jù)工期要求、技術(shù)標(biāo)準(zhǔn)、機械設(shè)備能力、材料供應(yīng)、自然條件等進(jìn)行綜合分析,選擇Z佳施工方案,完善施工組織設(shè)計。
8. According to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., conduct comprehensive analysis, select the z-best construction scheme and improve the construction organization design.