淺析公路冷再生工程現(xiàn)場施工應注意事項?
來源:http://www.beianedu.cn/ 日期:2021-07-16
充分的施工準備
Adequate construction preparation
施工現(xiàn)場管理貫穿于工程施工的全過程,充分的施工準備是管理好施工現(xiàn)場的基礎。施工單位只有通過充分的施工準備,才能保障施工過程的連續(xù)、協(xié)調、均衡和經(jīng)濟。在進行施工準備工作中應注意以下問題:
Construction site management runs through the whole process of engineering construction, and sufficient construction preparation is the basis of good construction site management. Only through sufficient construction preparation can the construction unit ensure the continuity, coordination, balance and economy of the construction process. The following problems should be paid attention to in the construction preparation work:
1.要建立嚴謹、規(guī)范的內部約束、考核、激勵機制,用制度管人,用規(guī)章管理工程。
1. It is necessary to establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with rules.
2.要補充調查工程沿線影響施工的因素,標注出平面位置圖,并進行、論證,寫出調查報告,作為修訂施工方案、編制施工控制預算的依據(jù)。
2. The factors influencing the construction along the line of the project should be investigated, the plane location map should be marked, and the investigation report should be written as the basis for revising the construction scheme and compiling the construction control budget.
          冷再生機出租
3.施工圖紙,吃透設計意圖,澄清圖紙中的問題,恢復定線和施工放樣。對所有控制點進行加密、保護、記錄。
3. Construction drawings, understand the design intention, clarify the problems in the drawings, restore the alignment and construction lofting. Encrypt, protect and record all control points.
4.根據(jù)施工合同協(xié)議和現(xiàn)場調研認真編制施工控制預算,作為控制支出、進行成本預測分析、經(jīng)濟核算以及統(tǒng)計工程進度的依據(jù)。
4. According to the construction contract agreement and field investigation, carefully prepare the construction control budget as the basis for controlling expenditure, cost prediction and analysis, economic accounting and project progress statistics.
5.進行業(yè)務、技術培訓和技術交底,使相關人員對工程的技術標準、操作規(guī)程、質量控制、資料整理有全 面的了解。
5. Conduct business, technical training and technical disclosure, so that the relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6.建立工地試驗室,并申請臨時資質。對施工中擬使用的各種原材料取樣試驗,建立相關技術參數(shù)的數(shù)據(jù)庫。
6. Set up site laboratory and apply for temporary qualification. The database of relevant technical parameters is established for the sampling test of various raw materials to be used in the construction.
7.繪制關鍵工序施工工藝流程圖和試驗操作規(guī)程、質量檢查評定、計量支付、設計變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the key process construction process flow chart and test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident handling and other operation management block diagram, and make the chart on the wall.
8.根據(jù)工期要求、技術標準、機械設備能力、材料供應、自然條件等進行綜合分析,選擇佳施工方案,完善施工組織設計。
8. According to the requirements of construction period, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., conduct comprehensive analysis, select the best construction scheme, and improve the construction organization design.