概述冷再生泡沫瀝青冷再生機出租施工的技術(shù)流程!
來源:http://www.beianedu.cn/ 日期:2020-09-28
  泡沫瀝青冷再生施工技術(shù),本質(zhì)上是把泡沫瀝青的一些優(yōu)良特性運用到實際應(yīng)用中的施工技術(shù)。但是,用戶要想充分發(fā)揮技術(shù)優(yōu)勢,在實際施工過程中需要遵循以下流程:
  The cold recycling construction technology of foamed asphalt is essentially the application of some good characteristics of foamed asphalt to practical application. However, in order to give full play to the technical advantages, users need to follow the following process in the actual construction process:
  在施工過程中,冷再生機出租回來之后,要先用銑刨機對要鋪筑的瀝青面層進行清理。待檢修的路面應(yīng)磨平至基層。其由裝載車重新裝載,之后鋪設(shè)泡沫瀝青混凝土。在這里需要提醒大家注意的問題是:此項冷再生技術(shù)在鋪設(shè)新路面的過程中并不會受到天氣條件的限制,即使在寒冷的天氣和雨天,依然可以進行正常的施工作業(yè)。從這一點我們可以看出,它在當(dāng)今市場上得到了廣泛的應(yīng)用。
  In the construction process, after the cold recycling machine is rented back, the milling machine should be used to clean the asphalt surface course to be paved. The pavement to be repaired shall be ground to the base course. It is reloaded by loading truck and then foamed asphalt concrete. Here we need to pay attention to the problem is: this cold recycling technology in the process of laying new pavement will not be limited by weather conditions, even in cold weather and rainy days, can still carry out normal construction work. From this we can see that it has been widely used in today's market.
  以上便是泡沫瀝青在建筑施工中的冷再生技術(shù)。用戶只要按上述工藝進行攤鋪,效果是有保證的。
  The above is the cold recycling technology of foamed asphalt in construction. As long as users carry out paving according to the above process, the effect is guaranteed.
               冷再生機出租
  冷再生機出租在項目實施過程中,為了保證項目的效果,需要進行質(zhì)量控制。那么,究竟應(yīng)該怎么控制冷再生的質(zhì)量問題呢?為保證冷再生的質(zhì)量控制,應(yīng)遵循以下三點:
  In order to ensure the effect of the project, quality control is needed in the process of project implementation. In order to ensure the quality control of cold regeneration, the following three points should be followed:
  一、原材料的各項試驗必須在施工前進行,檢驗合格后方可使用。施工前需要對混合料進行多種試驗,用于確認材料沒有發(fā)生變化后方可正常施工。
  1、 All tests of raw materials must be carried out before construction and can be used only after passing the inspection. Before construction, a variety of tests should be carried out on the mixture to confirm that the material has not changed before normal construction.
  二、在施工的時候,需要隨時檢測混合料中粘結(jié)劑和外加劑的含量,這樣得以保證施工的質(zhì)量問題。
  2、 During the construction, it is necessary to detect the content of binder and admixture in the mixture at any time, so as to ensure the quality of construction.
  三、在施工的過程中,需要根據(jù)混合料的攪拌和加工性能,及時調(diào)整消耗的水量。
  3、 In the process of construction, it is necessary to adjust the water consumption timely according to the mixing and processing performance of the mixture.
  以上是關(guān)于冷再生泡沫瀝青冷再生機施工的技術(shù)流程的介紹,希望對大家有所幫助,如想了解更多內(nèi)容歡迎點擊我們的冷再生機出租www.beianedu.cn官網(wǎng)。
  The above is an introduction to the technical process of cold regeneration foam asphalt cold recycling machine construction. We hope to help you. If you want to know more about it, please welcome our cold recycling machine to rent. www.beianedu.cn Official website.